Bambini Early LEarning
The project involved refurbishment of the current playground and the design and installation of a custom timber fort at the Bambini Early Learning Centre in Brighton, Asling Street. The project aimed to enhance the outdoor play experience for the children while ensuring safety and compliance with Australian standards.
Playground Structure Installation: The centerpiece of the project was the installation of a custom-designed timber fort, complete with a slide, stairs, climbing net, rock wall, balustrade, and merbau decking.
Site Preparation: The project began with the careful demolition of existing playground elements to make way for the new structure. This included the removal of timber log uprights, garden edging, and shrubs. The site was then excavated and prepared for the fort's installation, with proper base preparation to ensure stability and longevity.
Landscaping: To enhance the overall play environment, the project included the repair and improvement of existing garden edging, synthetic turf, and softfall pads. This ensured a safe and visually appealing play area for the children.
Design and Consulting: The project involved comprehensive design and consulting services, including the design and certification of the timber fort, critical fall height drop testing, and structural engineering review and certification. These measures guaranteed the fort's compliance with safety standards and regulations.
Site and Project Management: LeadBuilt provided dedicated site and project management throughout the project's duration. This ensured that the playground works were carried out safely, efficiently, and to the highest standard, minimizing disruption to the center's operations.